Long lead
Suggestions for Long lead
Experience uninterrupted audio with Sony WHCH520B Wireless Noise Cancelling Headphones - crystal-clear sound, 50hr battery, & built-in mic for calls in sleek black
Wahl ceramic coated curling tongs with 19 mm barrel width optimal for creating smooth glossy waves and gorgeous natural looking curls. - 200 degree max temperature and quick heat function, these tongs let you create your style whilst minimising the risk o
Unleash creativity with Crayola's vibrant pack of 12 colored pencils, perfect for art projects and school supplies. Durable, non-toxic, and pre-sharpened for immediate use
High-quality Pica Dry Carpenters graphite pencil refills in 4030 shade, perfect for marking surfaces. Quantity: 10.
Heavy Duty work power 50m Cable reel 4 x 13 amp rated sockets with safety shutters Open Cable reel design with strong zinc plated steel frame Safety thermal cut out to prevent overheating Fitted with flexible cable and Manu
Retractable giant dog leash with neon strap, 8 meters long, suitable for large dogs up to 50kg.
The New Classic M with a cord length of 5 m offers plenty of freedom of movement for medium dogs up to 20 kg.The classic, perfect flexi New Classic M 5 m cord lead can be customized with clever accessories and is ideal for medium dogs up to 20 k
8 m cord lead can be accessorized with the multi box and/or the led lighting system, for dogs up to 12 kg, as an introduction to the world of custom retractable leades Intuitive handling, thanks to convenient brake button and ergonomic grip
Discover the Flexi Classic Tape in blue—perfect for medium-sized dogs up to 25kg. This 5-meter retractable leash offers a blend of comfort and control, ensuring safe walks with its durable design.
This retractable dog leash is perfect for dogs up to 25kg. The black tape measures 5m and comes in a classic design. It features a secure locking mechanism and comfortable handle.
Flexi Classic Small Blue Tape is a 5-meter retractable dog leash designed for dogs up to 15kg. Made of durable blue tape, it provides safety and comfort while allowing your dog freedom to roam.
New Classic – the classic, perfect retractable lead from flexi, featuring a stylish design and an ergonomic grip. - The New Classic S with a tape length of 5 m offers plenty of freedom for small dogs up to 15 kg. - The classic, perfect flexi New Classic
Discover the perfect music companion, a melodious CD now available in stores near you, featuring soulful tracks to elevate your mood and spirit.
The Flexi Classic L is a 5-meter long dog leash with a retractable mechanism, suitable for dogs weighing up to 20 kg. Made of high-quality materials, it offers both comfort and safety during walks.
The Flexi New Comfort Tape dog lead is a 5-meter long retractable leash that comes in black and is designed for dogs weighing less than 15kg. It features a comfortable handle and is made from durable materials, making it perfect for everyday use.
USE YOUR ELECTRICAL APPLIANCES SAFELY AROUND THE HOME: From Masterplug, with the 2 m, 6 gang extension lead - THE SIX SOCKET EXTENSION LEAD HAS A 13 AMP FUSE: Eliminates the problem when the number of electrical items outnumber the amount of available soc
USE YOUR ELECTRICAL APPLIANCES SAFELY AROUND THE HOME: From Masterplug, with the 1-metre, 4 gang extension lead - THE FOUR SOCKET EXTENSION LEAD HAS A 13 AMP FUSE: Eliminates the problem when the number of electrical items outnumber the amount of availabl
5 m cord lead which can be accessorized with the multi box and/or the led lighting system, for dogs up to 20 kg, as an introduction to the world of custom retractable leades Intuitive handling, thanks to convenient brake button and ergonomic gri
Extrastar 1-Gang Unswitched Orange Extension Lead with 20M Cable, 13A. Orange in color and perfect for connecting electrical devices to power outlets.
This is a 1-gang unswitched 10meter orange extension lead. It features a durable and long-lasting design, made to connect multiple devices with ease. The 10meter length offers flexibility in placement while the orange color adds a pop of style.
Filters



































